Construction – Project

MEI Works of Package 1 – EPC Package 2 – Utilities & Offsites of the Duqm Refinery Project

Client: Petrofac – Samsung JV Engineering (South Korea) – (TTS JV)

MEI works for the Package-1, Duqm Refinery, (EPC-2, Utilities & Offsites- Crude, Product Storage Tank area, which includes Structural, Mechanical, Piping Erection, Equipment erection, Electrical and Instrumentation, Telecom, Painting, Insulation and Fire Proofing work, testing, finishing & Pre-commissioning & commissioning assistance.

Peak Manpower

850 Numbers

Total Man Hours

5.7 million

Years

2019 to 2022

  • Structural steel works (pipe racks, platform, ladder, walkways etc.) – 2,593.2MT
  • Fabrication and erection of piping Works and fittings.
  • Vendor skids and interconnecting piping
  • Piping works (Piping- 101,515 ID | Piping- 902,863 IM)
  • Erection of Static Equipment, Static Package & Skid Equipment, Rotary Equipment, Pre-Assembled Modules – 1,017.6MT (Column, Reactor, Accumulator, Heat Exchanger, Air cooler, Pumps etc)
  • Fireproofing and Refractory works – 2,717Sqm
  • Painting- 22,500Sqm
  • Insulation- 56,589Sqm
  • Coating & Wrapping works for U/G piping

Electrical works for the Installation & testing of

  • Electrical Equipment: 3431 MT
  • Laying of Cables & Conductors: 4800 KM
  • Installation of Cable Tray/ Ladder and Accessories: 125 KM
  • Installation of Lighting Fixtures / Poles / Switched-Socket / Junction Box – 32563 Nos

Installation & testing of telecom instruments, systems, towers, installation antennas, feeder, cables poles, CCTV, radio system, access controls etc. – 900 Nos

for the installation & testing of

  • Field instruments (Valves, flow assembles & meters, gauges , analyzer, transmitters, switches etc.) : 2350 Nos
  • Laying of Instrument, FOC, Telecom cables: 420 KM
  • Installation of Cable trays 35 KM
  • Calibration of instruments
  • Fire & Gas system installation