Tank EPC, Construction – Project
EPC of 1 Cryogenic Tank for Air Separation Unit at Air Liquide Sohar Industrial Gases
Client: Air Liquide Sohar Industrial Gases
End User: ______
Scope: Tank EPC

Peak Manpower
68 Numbers
Total Man Hours
.348 million
Execution Timeline
2018
Number of Tanks
1 No.
Scope: Engineering, procurement, Shop Fabrication, Transportation to site, Site erection, Nondestructive testing, Painting & Hydro-testing, commissioning of 1 LIN storage tank (Cryogenic Tank).
Tank Details
Tank: LIN storage tank (Cryogenic Tank) (Tank No. V50)
- Dimensions:
-
- Outer casing– Inner Dia 17.150 m x 14.462 m Height
- Inner Vessel – Inner Dia 14.950 m x 12.895 m Height
-
- Equipment Weight: 116 Mt
- Material: a 240 304 L
- Tank Capacity: 1126 Cub Mtr
- Process Fluid: LIQUID NITROGEN