Tank EPC, Construction – Project

EPC of 1 Cryogenic Tank for Air Separation Unit at Air Liquide Sohar Industrial Gases

Client: Air Liquide Sohar Industrial Gases
End User: ______
Scope: Tank EPC
Peak Manpower

68 Numbers

Total Man Hours

.348 million

Execution Timeline

2018

Number of Tanks

1 No.

Scope: Engineering, procurement, Shop Fabrication, Transportation to site, Site erection, Nondestructive testing, Painting & Hydro-testing, commissioning of 1 LIN storage tank (Cryogenic Tank).

Tank Details

Tank: LIN storage tank (Cryogenic Tank) (Tank No. V50)

  • Dimensions:
      • Outer casing– Inner Dia 17.150 m x 14.462 m Height
      • Inner Vessel – Inner Dia 14.950 m x 12.895 m Height
  • Equipment Weight: 116 Mt
  • Material: a 240 304 L
  • Tank Capacity: 1126 Cub Mtr
  • Process Fluid: LIQUID NITROGEN