Construction – Project
MEI Works of Package 1 – EPC Package 2 – Utilities & Offsites of the Duqm Refinery Project
Client: Petrofac – Samsung JV Engineering (South Korea) – (TTS JV)
MEI works for the Package-1, Duqm Refinery, (EPC-2, Utilities & Offsites- Crude, Product Storage Tank area, which includes Structural, Mechanical, Piping Erection, Equipment erection, Electrical and Instrumentation, Telecom, Painting, Insulation and Fire Proofing work, testing, finishing & Pre-commissioning & commissioning assistance.
Peak Manpower
850 Numbers
Total Man Hours
5.7 million
Years
2019 to 2022