Tank EPC, Construction – Project

EPC of 5 Chamber Gas Floatation Tank (eGFT) & Oil Storage Tank

Client: Enerflex
End User: PDO
Scope: Tank EPC
Peak Manpower

125 Numbers

Total Man Hours

1.33 million

Execution Timeline

2021 to 2022

Number of Tanks

2 Nos.

Scope: Engineering, procurement, construction, commissioning, Hydrotesting, NDT, and Painting works for One 5-Chamber Gas Floatation Tank (eGFT) & One Oil Storage tank.

Tank Details

Tank: 5-Chamber eGF (Tank No. T-891002)

  • Dimensions: ID 25m x H 12.5m
  • Equipment Weight: 579 Mt
  • Material: A 516 Gr. 60/70
  • Tank Capacity: 4558 Cub Mtr
  • Process Fluid: OIL + WATER

Tank: (Oil Storage Tank) (Tank No. T-891003)

  • Dimensions: ID 7.5m x H 12.5m
  • Equipment Weight: 30 Mt
  • Material: A 516 GR.60
  • Tank Capacity: 1208 Cub Mtr
  • Process Fluid: Oil