Basin 3 Bulk Liquid Bulk Terminal Sonkna Port, Egypt

Equipment: Boil-Off Gas Re-Liquefaction, Refrigeration & Compression
Year of Supply

2019 & 2020

Client

Petrojet
Sonker

Country


Egypt

Product Data:

  • 1800 kW net refrigeration capacity at -40°C
  • 6 x Two-stage screw BOG compressors, Kobelco KS31LTX
  • 4 x Two-stage screw Recondensation compressors, Kobelco KS31STX
  • 9 x Air Cooled heat exchangers for condensers and oil coolers
  • 5 x receivers, 2 x flash economisers and 3 x subcooler and suction drums
  • Interconnecting piping and pipe rack
  • 30 x Unit Control Panels and associated control logic

The BOG Re-liquefaction maintains the pressure in 3 x 50,000 m3 storage tanks by liquefying Boil Off Gas (BOG) during various operating cases. The BOGRe-liquefaction is a cascade system, comprising three open BOG Re-liquefaction cycles and one closed Propane Refrigerant Cycle System (Re-condensation system) to sub-cool the condensed BOG.

The complete package, including all the mechanical, instrumentation, and electrical equipment, is installed outdoors in Sokhna Port, Egypt. Highly tailored control logic is implemented to control the operation of the BOG Re-liquefaction system during various modes of operation.

Very stringent fire protection requirements apply to the complete package with all hydrocarbon piping and equipment covered in various passive fire protection systems such as intumescent or insulation type.

Sonker terminal will serve as the main supply of LPG to the Egyptian network.